Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Content imported from a Scroll Translations translation file.

...

Sv translation
languageen

Anchor
Top
Top

So that you can upload the planning data of a specialist model created in Allplan to Bimplus, the Allplan project must be linked with the Bimplus project containing the coordination building model of the construction project. Being irreversible, this link will be created the first time you upload data from an Allplan project to Bimplus.

Using the Bimplus web portal, the BIM coordinator responsible for the construction project usually creates the Bimplus project used for linking at an earlier stage. So the Bimplus project already exists. When uploading data for the first time, you simply decide whether you want to create a new specialist model in this project or update an existing model, that is to say, overwrite the last revision. As an alternative, you can also create the Bimplus project directly when you upload data from Allplan for the first time (provided you have the required rights).

The next time you upload data from an Allplan project that is already linked with a Bimplus project, you can change neither the Bimplus project nor the model. In this case, you can only update the existing model or create a new revision.

Info

Note: Each new project you create in Allplan gets a unique ID. Even if you import a project backup to a new Allplan project with the same name as the original project, the ID of the backed up project is different from the ID of the new project. Therefore, in this context, "uploading for the first time" means uploading data from an Allplan project whose ID is not linked with any Bimplus project in the current Bimplus team.

Info
iconfalse
titleTopics on this page:

Table of Contents
maxLevel1
indent1
stylesquare

 

 

Using Allplan to log in to Bimplus
Anchor
Using Allplan to log in to Bimplus
Using Allplan to log in to Bimplus

To upload data straight from Allplan to Bimplus, you must log in to Bimplus from your Allplan workstation. You get the necessary login details after registration at with Bimplus.

Info

Important!
You can log in to Bimplus using Allplan independently of logging in to Bimplus using the Bimplus web portal. In other words, logging in to Bimplus using Allplan does not automatically log you in to Bimplus using the Bimplus web portal and vice versa.

 To use Allplan to log in to Bimplus

Info
iconfalse
titleThis is only possible only if ...

→ You are a registered Bimplus participant (see "Ihre Bimplus Registrierung")
→ Allplan is running

  1. Click Login

  2.  Image Removed
  3. on the title bar of Allplan (Allplan V2017 and earlier: on the menu bar).

    The

  4. Bimplus
  5. Image Added BIMPLUS dialog box opens.

  6. Enter you login details.

    Info

    Note: Use the email address and password you specified when you registered at with Bimplus. As an alternative, you can also use your login details for Allplan Connect.

  7. Click Login.

Go Back to top

 

 

Linking an Allplan project with a Bimplus project
Anchor
Linking an Allplan project with a Bimplus project
Linking an Allplan project with a Bimplus project

If you want to upload planning data of a specialist model from an Allplan project to Bimplus for the first time, you must link the Allplan project with the corresponding Bimplus project first.

The Bimplus project used for linking is usually created by the BIM coordinator responsible for the construction project. As an alternative, you can also create a new Bimplus project while uploading the data. However, only the owner or an administrator of a Bimplus team is allowed to can create new Bimplus projects in this team. Therefore, the team owner or a team administrator must upload the data for the first time.


Info

Important!
In any case, the link between the Allplan project and the Bimplus project is irreversible. This link will be created the first time you upload data.

 To link an Allplan project with a Bimplus project

Info
iconfalse
titleThis is only possible only if ...

→ Allplan is running
→ You have used your Allplan workstation to log in to Bimplus (see "Using Allplan to log in to Bimplus")
→ The relevant Allplan project is open
→ You have the required rights (see "Rights Rechte in Bimplus")

  1. Make sure all design elements you want to upload to Bimplus are visible in the project.

    To do this, check the status of the drawing files, which should be set to current, open in edit mode or open in reference mode. Then check the status of the layers, which should be set to at least Visible, frozen.

  2. Open the File menu, point to Export and click

  3. Click Image Added Upload Model to Bimplus (Teamwork task - Bimplus task area; Allplan V2017 and earlier: File menu - Export - Image Modified Export Bimplus Data).

    The

  4. Allplan
  5. Upload Model to Bimplus

  6. Upload
  7. dialog box opens.

  8. Only if If you are a member of several Bimplus teams:
    Go to Select the Bimplus team who is to edit the project in the TEAM area and select the relevant Bimplus team.

  9. If the Bimplus project has already been created exists:
    Go to the PROJECT area - Projects table and select the Select the Bimplus project to which you want to upload the planning data (possible for Bimplus project administrators and Bimplus project editors) in the PROJECT area - Projects table.

    Or:

    If the Bimplus project has does not yet been created exist:
    Go In the PROJECT area below the Projects table, click Create new Bimplus project and enter type a name for the new Bimplus project (only possible for the Bimplus team owner or a team administrator).

  10. Go to In the PROJECT area below the Models table, click Create new Bimplus model and enter type a name for the new Bimplus specialist model.

  11. Click Upload.

  12. This
  13. The program links the Allplan project with the selected Bimplus project, uploading the planning data to Bimplus.

  14. As soon as the process has finished, you can see a message. Click OK to confirm this message.


Go Back to top

 

 

Getting information about the Bimplus project linked with an Allplan project

To get information about the Bimplus project linked with an Allplan project

Info
iconfalse
titleThis is only possible only if ...

→ Allplan is running
→ You have used your Allplan workstation to log in to Bimplus (see "Using Allplan to log in to Bimplus")
→ The → The relevant Allplan project is open and linked with a Bimplus project (see "Linking an Allplan project with a Bimplus project")

  1. Click Image Modified Settings at the bottom of the palette.

    The Settings dialog box opens, displaying information about the Bimplus project linked with the current Allplan project and about the Bimplus team

  2. editing
  3. to which this Bimplus project is assigned.


Go Back to top

 

 

Updating the planning

status

data of an Allplan project on Bimplus

As soon as an Allplan project is linked with a Bimplus project, you can decide whether you want to update (= or overwrite ) the planning status data of the specialist model or create a new revision of the model. You can decide this every time you upload planning data from this Allplan project to Bimplus.

Info

Note: However, you You can change neither the Bimplus project nor the model in this phase.

To update the planning

status

data or create a new revision

Info
iconfalse
titleThis is only possible only if ...

→ Allplan is running
→ You have used your Allplan workstation to log in to Bimplus (see "Using Allplan to log in to Bimplus")
→ The relevant Allplan project is open and linked with a Bimplus project (see "Linking an Allplan project with a Bimplus project")
→ You have the required rights (see "Rights in Bimplus")

  1. Make sure all design elements you want to upload to Bimplus are visible in the project.

    To do this, check the status of the drawing files, which should be set to current, open in edit mode or open in reference mode. Then check the status of the layers, which should be set to at least Visible, frozen.

  2. Open the File menu, point to Export and click Image Removed

  3. Click Image Added Upload Model to Bimplus (Teamwork task - Bimplus task area; Allplan V2017 and earlier: File menu - Export - Image Added Export Bimplus Data).

    The

  4. Allplan
  5. Upload Model to Bimplus

  6. Upload
  7. dialog box opens.
    Only if

  8. If you are a member of several Bimplus teams:

  9. Go to the TEAM area and select the
  10. Select the Bimplus team

  11. who is to edit the project
  12. to which the project is assigned in the TEAM area.

    Info

    Note: If you have the required rights, you can also create a new Bimplus project in another Bimplus team and add the model as a new model to this new Bimplus project.

  13. In the Upload setting, choose Setting area, you can decide whether you want to update the existing model, overwrite it or to create a new revision.

    Update the current model
    Updates the current model based on the selected design elements (see step 1) that have changed since the last upload.

    Upload current model again
    Replaces the current model with the design elements selected in (see step 1).

    Create a new revision
    Creates a new revision of the model, keeping the original version. You can still display and edit the old version using the Bimplus web portal.

  14. Click Upload.

    This

    exports

    uploads the planning data from Allplan

    , uploading the data

    to Bimplus.

  15. As soon as the process has finished, you can see a message. Click OK to confirm this message.

Go Back to top