Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

So that you can upload the planning data of a specialist model created in Allplan to Bimplus, the Allplan project must be linked with the Bimplus project in which you maintain the building model of the construction project. Being irreversible, this link will be created the first time you upload data from an Allplan project to Bimplus.

By using the BIMPLUS web portal, the BIM coordinator responsible for the construction project usually creates the required Bimplus project at an earlier stage. So the Bimplus project already exists. When you upload data for the first time, you simply decide whether you want to create a new specialist model in this project or update an existing model, that is to say, overwrite the last revision. As an alternative, you can also create the Bimplus project directly when you upload data from Allplan for the first time (if you have the required rights).

The next time you upload data from an Allplan project that is already linked with a Bimplus project, you can change neither the Bimplus project nor the model. In this case, you can only update the existing model or create a new revision.

Sv translation
languagede

Anchor
seitenanfang
seitenanfang

Um die Planungsdaten eines mit Allplan geplanten Fachmodells direkt aus Allplan nach Bimplus hochladen zu können, muss das Allplan Projekt mit dem Bimplus Projekt verknüpft sein, in dem das Bauwerksmodell des gesamten Bauvorhabens gepflegt wird. Diese Verknüpfung wird beim jeweils erstmaligen Hochladen von Daten aus einem Allplan Projekt nach Bimplus geschlossen und ist irreversibel.

Das für die Verknüpfung verwendete Bimplus Projekt wird i.d.R. von dem für das Bauvorhaben verantwortlichen BIM-Koordinator zu einem früheren Zeitpunkt über das Webportal BIMPLUS angelegt; in diesem Fall entscheiden Sie beim erstmaligen Hochladen lediglich, ob in diesem Projekt ein neues Fachmodell erzeugt oder ein Bestehendes aktualisiert, d.h. die letzte Revisionsfassung überschrieben werden soll. Alternativ kann das Bimplus Projekt, entsprechende Rechte vorausgesetzt, auch direkt während des erstmaligen Hochladens von Allplan aus neu angelegt werden.

Bei jedem weiteren Upload aus einem solchen, mit einem Bimplus Projekt bereits verknüpften Allplan Projekt können weder das Bimplus Projekt noch das Modell gewechselt werden; in diesem Fall ist ausschließlich entweder eine Aktualisierung des bestehenden Modells oder das Erzeugen einer neuen Revisionsfassung vorgesehen.

Info

Hinweis: Jedes in Allplan neu angelegte Projekt erhält einen eindeutigen Identifikationscode. Auch wenn Sie beim Einspielen einer Projektsicherung in Allplan ein neues Projekt mit unveränderter Projektbezeichnung anlegen, unterscheidet sich der Identifikationscode des gesicherten Projekts von dem des während des Einspielens neu angelegten Projekts. Demnach bedeutet „zum ersten Mal hochladen“ in diesem Zusammenhang das Hochladen aus einem Allplan Projekt, dessen Identifikationscode mit keinem der Bimplus Projekte im aktuellen Bimplus Team verknüpft ist.



Info
iconfalse
titleThemen auf dieser Seite:

Table of Contents
maxLevel2
minLevel2
indent1px
stylesquare

 

 




Über Allplan bei

Bimplus

den Allplan Webservices anmelden
Anchor
In Allplan bei Bimplus anmelden
In Allplan bei Bimplus anmelden

Um Daten von Allplan aus direkt nach Bimplus hochladen zu können, müssen Sie über Ihren Allplan Arbeitsplatz bei Bimplus bei den Allplan Webservices angemeldet sein. Die hierfür erforderlichen Zugangsdaten erhalten Sie nach erfolgter Registrierung bei Bimplus.

Info

Wichtig!
Hinweis: Die Anmeldung bei Bimplus über einen Allplan Arbeitsplatz und die Anmeldung beim über das Webportal BIMPLUS sind trotz identischer Anmeldedaten (E-Mail-Adresse und Passwort) voneinander unabhängig. Auch wenn identisch. Haben Sie sich bereits beim über das Webportal BIMPLUS bei den Allplan Webservices angemeldet haben, sind müssen Sie nicht automatisch ebenfalls über einen sich nicht erneut über Ihren Allplan Arbeitsplatz bei Bimplus angemeldet anmelden und umgekehrt.


So melden Sie sich über Ihren Allplan Arbeitsplatz bei

Bimplus

den Allplan Webservices an

Info
iconfalse
titleVoraussetzungen:

→  Sie sind registrierter bei Bimplus Teilnehmer registriert (siehe „Ihre Bimplus Registrierung“)
→  Allplan ist gestartet

  1. Klicken Sie in der Titelleiste von Allplan auf  Login.

    Das Dialogfeld BIMPLUS ALLPLAN wird eingeblendet.

  2. Geben Sie Ihre Zugangsdaten ein.

    Info

    Hinweis: Als Zugangsdaten verwenden Sie entweder die im Zusammenhang mit Ihrer Registrierung bei Bimplus angegebene E-Mail-Adresse und das dort von Ihnen gewählte Passwort oder – sofern verfügbar – Ihre Allplan Connect Zugangsdaten.


  3. Klicken Sie auf Login.

↑ zum Seitenanfang

 

 



Allplan Projekt mit Bimplus Projekt verknüpfen
Anchor
Allplan Projekt mit Bimplus Projekt verknüpfen
Allplan Projekt mit Bimplus Projekt verknüpfen

Möchten Sie aus einem Allplan Projekt erstmalig Planungsdaten eines Fachmodells nach Bimplus hochladen, müssen Sie das Allplan Projekt zunächst mit dem entsprechenden Bimplus Projekt verknüpfen.

Für die Verknüpfung verwenden Sie i.d.R. das vom zuständigen BIM-Koordinator für das Bauvorhaben bereits angelegte Bimplus Projekt. Alternativ kann das Bimplus Projekt auch während des Hochladens neu angelegt werden. Da jedoch nur der Eigentümer bzw. ein Administrator eines Bimplus Teams in seinem Team neue Bimplus Projekte anlegen darf, muss in diesem Fall der Teameigentümer oder ein Teamadministrator das erste Hochladen persönlich vornehmen.

Info

Wichtig!
Eine bestehende Verknüpfung zwischen Allplan Projekt und Bimplus Projekt kann nur dadurch geändert werden, dass das für das Allplan Projekt angelegte Bimplus Modell aus dem Bimplus Projekt gelöscht wird (siehe „Fachmodelle löschen“).


So verknüpfen Sie ein Allplan Projekt mit einem Bimplus Projekt

Info
iconfalse
titleVoraussetzungen:
  1. Schalten Sie alle Konstruktionselemente des Projekts sichtbar, die nach Bimplus hochgeladen werden sollen.

    Wählen Sie dazu für die betreffenden Teilbilder den Status aktiv, aktiv im Hintergrund oder passiv; schalten Sie alle betreffenden Layer sichtbar, indem Sie zumindest den Layerstatus sichtbar, gesperrt einstellen.

  2. Klicken Sie auf Modell nach Bimplus hochladen (Aufgabenbereich Teamwork → Aufgabe Bimplus).

    Oder:

    Klicken Sie in der Palette Issue Manager auf Upload.

    Das Dialogfeld Modell nach Bimplus hochladen wird eingeblendet.

  3. Nur, wenn Sie Mitglied in mehreren mehrerer Bimplus Teams sind:
    Wählen Sie im Bereich Team das Bimplus Team, von dem das Projekt bearbeitet werden soll.

  4. Wenn das vorgesehene Bimplus Projekt bereits angelegt ist:
    Wählen Sie im Bereich Projekt in der Tabelle Projekte das Bimplus Projekt, in das die Planungsdaten eingespielt werden sollen (für Bimplus Projektadministratoren und Bimplus Projektbearbeiter erlaubt).

    Oder:

    Wenn das vorgesehene Bimplus Projekt noch nicht angelegt ist:
    Klicken Sie im Bereich Projekt unterhalb der Tabelle Projekte auf  Neues Bimplus Projekt erzeugen und geben Sie den Namen für das anzulegende Bimplus Projekt an (ausschließlich für den Bimplus Teameigentümer oder einen Bimplus Teamadministrator erlaubt).

  5. Klicken Sie im Bereich Projekt unterhalb der Tabelle Modelle auf  Neues Bimplus Modell erzeugen und geben Sie den Namen für das anzulegende Bimplus Fachmodell an.

  6. Klicken Sie auf Hochladen.

    Das Allplan Projekt wird mit dem gewählten Bimplus Projekt verknüpft und die Planungsdaten werden nach Bimplus hochgeladen.

  7. Bestätigen Sie die nach Abschluss des Prozesses angezeigte Meldung mit OK.


↑ zum Seitenanfang

 

 



Informationen über Bimplus Verknüpfung abrufen

So rufen Sie Informationen zur Bimplus Verknüpfung eines Allplan Projekts ab

Info
iconfalse
titleVoraussetzungen:

→  Sie sind über Ihren Allplan Arbeitsplatz bei Bimplus sind bei den Allplan Webservices angemeldet (siehe „Über Allplan bei Bimplus den Allplan Webservices anmelden“)
→  Das betreffende Allplan Projekt ist geöffnet
→  Sie verfügen über die entsprechenden Rechte (siehe „Rechte in Bimplus“)

  1. Klicken Sie in der Aktionsleiste (unten) auf Einstellungen.

    Im Dialogfeld Einstellungen für ...  werden folgende Informationen angezeigt:

    Bimplus Team
    Name des Bimplus Teams, von dem das mit dem aktuellen Allplan Projekt verknüpfte Bimplus Projekt bearbeitet wird.

    Bimplus Projekt
    Bimplus Projekt, mit dem das aktuelle Allplan Projekt verknüpft ist.

    Bimplus Modell
    Name des Fachmodells, unter dem das aktuelle Allplan Projekt im Bimplus Projekt abgelegt ist.


↑ zum Seitenanfang 

 



Planungsstand eines Allplan Projekts auf Bimplus aktualisieren

Sobald ein Allplan Projekt mit einem Bimplus Projekt verknüpft ist, können Sie bei jedem erneuten Hochladen von Planungsdaten Modelldaten aus diesem Allplan Projekt entscheiden, ob der bestehende Planungsstand des Fachmodells aktualisiert, vollständig überschrieben oder eine neue Revisionsfassung des Modells angelegt werden soll.

Info

Hinweis: Ein Wechseln des Bimplus Projekts oder Modells ist in dieser Phase hingegen nicht mehr möglich.

So aktualisieren Sie einen Planungsstand bzw. erzeugen eine neue Revisionsfassung

Info
iconfalse
titleVoraussetzungen:

→  Sie sind über Ihren Allplan Arbeitsplatz bei Bimplus angemeldet (siehe „Über Allplan bei Bimplus anmelden“)
→  Das geöffnete Allplan Projekt ist mit dem betreffenden Bimplus Projekt verknüpft (siehe „Allplan Projekt mit Bimplus Projekt verknüpfen“)
→  Sie verfügen über die entsprechenden Rechte (siehe „Rechte in Bimplus“)

Schalten Sie alle Konstruktionselemente des Projekts sichtbar, die nach Bimplus hochgeladen werden sollen.

Wählen Sie dazu für die betreffenden Teilbilder den Status aktiv, aktiv im Hintergrund oder passiv; schalten Sie alle betreffenden Layer sichtbar, indem Sie zumindest den Layerstatus sichtbar, gesperrt einstellen.

Klicken Sie auf Image Removed Modell nach Bimplus hochladen (Aufgabenbereich Teamwork → Aufgabe Bimplus).

Das Dialogfeld Modell nach Bimplus hochladen wird eingeblendet.

Wählen Sie im Bereich Einstellung, ob das bestehende Modell aktualisiert, vollständig überschrieben oder ein neuer Revisionsstand erzeugt werden soll:

Das aktuelle Modell aktualisieren
Aktualisiert das aktuelle Modell mit den im 1. Schritt ausgewählten und seit dem letzten Hochladen geänderten Konstruktionselementen.

Das aktuelle Modell neu hochladen
Überschreibt das aktuelle Modell mit den im 1. Schritt ausgewählten Konstruktionselementen.

Eine neue Revision erzeugen
Erzeugt einen neuen Revisionsstand des Modells; die ursprüngliche Fassung bleibt erhalten und kann über das Webportal BIMPLUS auch weiterhin angezeigt und bearbeitet werden.

Klicken Sie auf Hochladen.

Die Planungsdaten werden aus Allplan nach Bimplus hochgeladen.
  • Bestätigen Sie die nach Abschluss des Prozesses angezeigte Meldung mit OK.
  • ↑ zum Seitenanfang

     

     

    Sv translation
    languageen
    Anchor
    TopTop
    Info

    Note: Each new project you create in Allplan gets a unique ID. Even if you import a project backup to a new Allplan project with the same name as the original project, the ID of the backed up project is different from the ID of the new project. Therefore, in this context, "uploading for the first time" means uploading data from an Allplan project whose ID is not linked with a Bimplus project of the current Bimplus team.

    Info
    iconfalse
    titleTopics on this page:

    Table of Contents
    maxLevel2
    minLevel2
    indent1px
    stylesquare

     

     

    Signing in to Bimplus from Allplan AnchorSigning in to Bimplus from AllplanSigning in to Bimplus from Allplan

    To upload data from Allplan directly to Bimplus, you must sign in to Bimplus from Allplan. You get the necessary details after registration with Bimplus.

    Info

    Important!
    You sign in to Bimplus from Allplan independently of signing in to the BIMPLUS web portal although you use the same details (email address and password). Even if you have already signed in to the BIMPLUS web portal, you are not automatically signed in to Bimplus from Allplan and vice versa.

    To sign in to Bimplus from Allplan

    in Bimplus vorhandene Planungsstand mit dem neuen Stand synchronisiert (d. h. lediglich die geänderten Elemente werden aktualisiert, die neu hinzugekommenen werden ergänzt) oder vollständig ersetzt werden soll. Zusätzlich können Sie wählen, ob dafür eine neue Revisionsfassung angelegt oder die bestehende Revision beibehalten wird. Alternativ kann für den aktuellen Upload auch ein völlig neues Fachmodell angelegt werden.

    Im Dialogfeld Modell nach Bimplus hochladen haben Sie dafür folgende Einstellmöglichkeiten:

      Image Added

    Mit dieser Einstellung werden die neuen Modelldaten zu den bestehenden Modelldaten hinzugefügt. Die Modellrevision bleibt unverändert. Beispiel: Die letzte Modellrevision ist 7. Wenn Sie diese Einstellung wählen, bleibt die Modellrevision 7 und die Modelldaten der letzten Revision werden mit neuen Modelldaten ergänzt.

      Image Added

    Mit dieser Einstellung werden die neuen Modelldaten zu den bestehenden Modelldaten hinzugefügt. Gleichzeitig wird eine neue Modellrevision erstellt. Beispiel: Die letzte Modellrevision ist 7. Wenn Sie diese Einstellung wählen, wird die neue Modellrevision zu 8 und die Modelldaten der letzten Revision werden mit neuen Modelldaten ergänzt.

      Image Added

    Mit dieser Einstellung werden die bestehenden Modelldaten vollständig durch die neuen Modelldaten ersetzt. Die Modellrevision bleibt unverändert. Beispiel: Die letzte Modellrevision ist 7. Wenn Sie diese Einstellung wählen, bleibt die Modellrevision 7 und die Modelldaten der letzten Revision werden durch die neuen Modelldaten ersetzt.

    Wichtig! Bitte beachten Sie, dass in diesem Fall sämtliche Daten der ersetzten Revision gelöscht werden, d. h. auch alle Links, Spots, Anhänge etc.

      Image Added

    Mit dieser Einstellung werden die bestehenden Modelldaten vollständig durch die neuen Modelldaten ersetzt. Gleichzeitig wird eine neue Modellrevision erstellt. Beispiel: Die letzte Modellrevision ist 7. Wenn Sie diese Einstellung wählen, wird die neue Modellrevision 8. Die letzte Modellrevision und die ursprünglichen Modelldaten bleiben in Revision 7.

      Image Added

    Mit dieser Einstellung wird auf Basis der neuen Modelldaten ein neues Fachmodell angelegt. Sämtliche bestehenden Modelldaten verbleiben unverändert im ursprünglichen Fachmodell.

    Info

    Hinweis: Ein Wechseln des Bimplus Projekts oder Modells ist in dieser Phase nicht mehr möglich.


    So aktualisieren Sie einen Planungsstand bzw. erzeugen eine neue Revisionsfassung

    Info
    iconfalse
    titleVoraussetzungen:

    →  Sie sind bei den Allplan Webservices angemeldet (siehe „Über Allplan bei den Allplan Webservices anmelden“)
    →  Das geöffnete Allplan Projekt ist mit dem betreffenden Bimplus Projekt verknüpft (siehe „Allplan Projekt mit Bimplus Projekt verknüpfen“)
    →  Sie verfügen über die entsprechenden Rechte (siehe „Rechte in Bimplus“)

    1. Schalten Sie alle Konstruktionselemente des Projekts sichtbar, die nach Bimplus hochgeladen werden sollen.

      Wählen Sie dazu für die betreffenden Teilbilder den Status aktiv, aktiv im Hintergrund oder passiv; schalten Sie alle betreffenden Layer sichtbar, indem Sie zumindest den Layerstatus sichtbar, gesperrt einstellen.

    2. Klicken Sie auf Image Added Modell nach Bimplus hochladen (Aufgabenbereich Teamwork → Aufgabe Bimplus).

      Das Dialogfeld Modell nach Bimplus hochladen wird eingeblendet.

    3. Wählen Sie im Bereich Einstellung, ob das bestehende Fachmodell mit den neuen Daten synchronisiert, vollständig überschrieben (jeweils mit/ohne neuem Revisionsstand) oder ein vollständig neues Fachmodell erzeugt werden soll (siehe oben).

    4. Klicken Sie auf Hochladen.

      Die Planungsdaten werden aus Allplan nach Bimplus hochgeladen.

    5. Bestätigen Sie die nach Abschluss des Prozesses angezeigte Meldung mit OK.

    ↑ zum Seitenanfang



    If you want to upload planning data of a specialist model from an Allplan project to Bimplus for the first time, you must link the Allplan project with the corresponding Bimplus project first.

    Use the Bimplus project that was created by the BIM coordinator responsible for the construction project. As an alternative, you can also create a new Bimplus project while uploading data. However, only the owner or an administrator of a Bimplus team is authorized to create new Bimplus projects in the team. Therefore, the team owner or a team administrator must upload the data for the first time.

    Sv translation
    languageen

    Anchor
    Top
    Top

    So that you can upload the planning data of a specialist model created in Allplan to Bimplus, the Allplan project must be linked with the Bimplus project in which you maintain the building model of the construction project. Being irreversible, this link will be created the first time you upload data from an Allplan project to Bimplus.

    By using the BIMPLUS web portal, the BIM coordinator responsible for the construction project usually creates the required Bimplus project at an earlier stage. So the Bimplus project already exists. When you upload data for the first time, you simply decide whether you want to create a new specialist model in this project or update an existing model, that is to say, overwrite the last revision. As an alternative, you can also create the Bimplus project directly when you upload data from Allplan for the first time (if you have the required rights).

    The next time you upload data from an Allplan project that is already linked with a Bimplus project, you can change neither the Bimplus project nor the model. In this case, you can only update the existing model or create a new revision.

    Info

    Note: Each new project you create in Allplan gets a unique ID. Even if you import a project backup to a new Allplan project with the same name as the original project, the ID of the backed up project is different from the ID of the new project. Therefore, in this context, "uploading for the first time" means uploading data from an Allplan project whose ID is not linked with a Bimplus project of the current Bimplus team.



    Info
    iconfalse
    titleTopics on this page:

    Table of Contents
    maxLevel2
    minLevel2
    indent1px
    stylesquare




    Signing in to Bimplus from Allplan
    Anchor
    Signing in to Bimplus from Allplan
    Signing in to Bimplus from Allplan

    To upload data from Allplan directly to Bimplus, you must sign in to Bimplus from Allplan. You get the necessary details after registration with Bimplus.

    Info

    Important!
    You sign in to Bimplus from Allplan independently of signing in to the BIMPLUS web portal although you use the same details (email address and password). Even if you have already signed in to the BIMPLUS web portal, you are not automatically signed in to Bimplus from Allplan and vice versa.

    To sign in to Bimplus from Allplan

    Info
    iconfalse
    titleThis is only possible if ...

    → You are a registered Bimplus participant (see "Ihre Bimplus Registrierung")
    → Allplan is running

    1. Click Image Added Login on the title bar of Allplan.

      You can see the Image Added BIMPLUS dialog box.

    2. Enter your email address and password.

      Info

      Note: Use the email address and password you specified when you registered with Bimplus. As an alternative, you can also use your details for signing in to Allplan Connect.


    3. Click Login.

    ↑ Back to top



    Linking an Allplan project with a Bimplus project
    Anchor
    Linking an Allplan project with a Bimplus project
    Linking an Allplan project with a Bimplus project

    If you want to upload planning data of a specialist model from an Allplan project to Bimplus for the first time, you must link the Allplan project with the corresponding Bimplus project first.

    Use the Bimplus project that was created by the BIM coordinator responsible for the construction project. As an alternative, you can also create a new Bimplus project while uploading data. However, only the owner or an administrator of a Bimplus team is authorized to create new Bimplus projects in the team. Therefore, the team owner or a team administrator must upload the data for the first time.


    Info

    Important!
    Only by deleting the Bimplus model created for the Allplan project from the Bimplus project can you change the link between the Allplan project and the Bimplus project (see “Deleting specialist models”).

    To link an Allplan project with a Bimplus project

    Info
    iconfalse
    titleThis is only possible if ...
    are a registered Bimplus participant Ihre Registrierung→ Allplan is running

    Click Image Removed Login on the title bar of Allplan.

    You can see the Image Removed BIMPLUS dialog box.

    Enter your email address and password.

    Info

    Note: Use the email address and password you specified when you registered with Bimplus. As an alternative, you can also use your details for signing in to Allplan Connect.

  • Click Login.
  • ↑ Back to top

     

     

    Linking an Allplan project with a Bimplus project
    Anchor
    Linking an Allplan project with a Bimplus projectLinking an Allplan project with a Bimplus project
    Info

    Important!
    Only by deleting the Bimplus model created for the Allplan project from the Bimplus project can you change the link between the Allplan project and the Bimplus project (see “Deleting specialist models”).

    To link an Allplan project with a Bimplus project
    1. Make sure all design elements that you want to upload to Bimplus are visible in the project.

      To do this, check the status of the drawing files, which should be current, open in edit mode, or open in reference mode. Then check the status of the layers, which should be at least visible, frozen.

    2. Click Image Added Upload Model to Bimplus (Teamwork task → Bimplus task area).

      Or:

      Click Upload in the Issue Manager palette.

      You can see the Upload Model to Bimplus dialog box.

    3. Only if you are a member of several Bimplus teams:
      Go to the Team area and select the Bimplus team team who is to work on the project.

    4. If the Bimplus project already exists:
      Go to the Project area - Projects table and select the Bimplus project to which you want to upload the planning data (possible for Bimplus project administrators and Bimplus project editors).

      Or:

      If the Bimplus project does not yet exist:
      Go to the Project area, click Image Added Create new Bimplus project under the Projects table, and enter a name for the new Bimplus project (this can be done only by the owner of the Bimplus team or an administrator of the Bimplus team).

    5. Go to the Project area, click Image Added Create new Bimplus model under the Models table, and enter a name for the new Bimplus specialist model.

    6. Click Upload.

      This links the Allplan project with the selected Bimplus project and uploads the planning data to Bimplus.

    7. Click OK to confirm the message that appears when the upload is completed.


    ↑ Back to top